Hackleton Play Area Presentation - Hackleton PC_001

Hackleton Play Area Hackleton Parish Council

Understanding your requirements Understanding Your Brief

Your Specification: The existing rocking horse, roundabout and slide are to be fully refurbished and included in the design of the new play area.

The playground equipment should fit in with the rural aspect of the village.

The playground equipment should include the following criteria/activities: • Swinging • Climbing • Sliding

• Spinning • Balancing • Include a Zip Line

The play area layout should be designed such that the equipment intended for younger children is grouped separately and together.

The area for younger users should also include seating for parents/minders.

Inclusive Play.

The play equipment must also comply with the DDA (Disability Discrimination Act) i.e. all- inclusive play and accessibility.

Hackleton Play Area - Hackleton Parish Council / 2

Our Aim - Robyn Brookes

We are very happy to present your new play area for Hackleton Recreation Ground. Our intention has been to create an imaginative playspace that fits in with the rural village location and offers children progressive play opportunities as they grow. To achieve this, we have designed a scheme with a variety of play experiences for toddlers all the way through to teens. The equipment colours will be muted and the rubber mulch safety surfacing combines a mix of natural green, brown and beige. There will be a subtle nature theme to the equipment itself with several of the items featuring insects which children may have come across in the natural world. Your improved play area offers physical, sensory and social play value for children with a wide range of abilities. Children can participate in play experiences such as, balancing, climbing, crawling, jumping, rotating, rocking, sliding, spinning, and swinging at a level they feel comfortable with. You will also have items specifically designed for inclusive play such as, the basket swing, satellite carousel, little beetle spring rocker with back support, sensory butterfly unit and interactive play panels. Leading to the play panels and through the play equipment is a DDA compliant path allowing access for wheelchair users and pushchairs. The design divides your playground into three areas, the toddler play provision, the junior play provision and an area of open grassland. Your new toddler area will be fully resurfaced, eradicating the need to mow any grass within the fence line and therefore reducing ongoing maintenance. The equipment within the fenced toddler area will include a spinning carousel, a toddler multiplay unit, a sensory play butterfly unit, and two spring rockers. Outside of the fence line we have included two toddler swings which are separated from the junior area with a landscaped mound. On the other side of this you will find the main junior play area. The praying mantis feature play unit we have chosen gives the playground the WOW factor and a large slide offers multiple climbing opportunities of differing challenge. In addition to the main unit, we have included a zip wire, 2 junior swings, a basket swing, interactive play panels, and refurbishment of the 3 play items requested. Your new playground will be highly durable and low ongoing maintenance. To reduce this maintenance, we have grouped areas of surfacing and removed any small areas of grass dividing them, in the toddler area surfacing the whole space inside the fence. The material specification for the equipment is predominantly metal with small elements in HDPE, LDPE and HPL.

In summary, Hackleton’s new Play Area will be a unique and exciting space for the local community to enjoy. If you have any questions about the play area please do not hesitate to contact me.

Robyn Brookes rbrookes@eibe.co.uk 07842318122

Hackleton Play Area - Hackleton Parish Council / 4

Hackleton Play Area - Hackleton Parish Council / 5

The Recreation Ground, Main Road, Hackleton, Northampton, NN7 2AD Location

Hackleton Play Area - Hackleton Parish Council / 6

Hackleton Play Area - Hackleton Parish Council / 7

AGE RANGE 0 - 14

100 USERS

HACKLETON NATURE THEMED PLAY AREA

+

4

2

3

Refurbish Existing Units

JUNIOR ZONE PLAY FOR 4 - 14 YEAR OLDS INCLUSIVE PLAY ACCESSIBLE SPINNING, SWINGING, PROBLEM SOLVING AND SENSORY PLAY DDA COMPLIANT PATH TODDLER ZONE FENCED OFF PLAY FOR 0 - 4 YEAR OLDS

CUSTOM COLOURS CAN BE REQUESTED

1 2

5

3

RUBBER BONDED SURFACING

4

FOLLOW THE GREEN DDA COMPLIANT PATH BETWEEN THE EQUIPMENT TO FIND PLAY BOARDS AT THE END! THIS PATH GIVES CHILDREN THE OPPORTUNITY TO DEVELOP THEIR CONFIDENCE AS IT HELPS THEM INDEPENDENTLY NAVIGATE THE PLAY SPACE LANDSCAPING LANDSCAPING IS USED TO SEPARATE THE TODDLER SWINGS FroM THE JUNIOR AREA. THE EXISTING SLIDE MOUND WILL ALSO BE REFURBISHED.

5

1

GRASS MATTING

INCLUSIVE, CHALLENGING & ENGAGING

A Y

I N

C

L

L

P

U

E

S I

V

S I

V

This is a concept design only, Actual colours and features may change at any time. This document is protected by copyright and is the property of eibe. It may neither be copied nor duplicated without our written consent. It may not be imparted or made accessible to a third person. A further usage needs the consent of eibe. Unlawful usage is liable to prosecution and is obliged to compensation.

E

U

P

L

L

C

A Y

I N

A Y

I N

C

L

L

P

U

E

S I

V

S I

V

E

U

P

L A Y • I N C L

L

A Y • I N

C

L U

P

E

S I

V

S I

V

E

U

P

L

L

C

A Y

I N

A Y

I N

C

L

L

P

U

E

S I

V

S I

V

E

U

P

L

L

C

A Y

I N

ROCKING

ACCESSIBLE SPINNING

BENCH FOR PARENTS/ MINDERS

SLIDING CHALLENGING JUNIOR ASCENTS

EXISTING

1

1

BALL MAZE PLAY PANEL

CLIMBING

SPINNING

EXISTING SLIDE REFURBISHED

1

EXISTING

RELOCATED BENCH

TODDLER SWINGS

QUADRUPLE SWING WITH INCLUISVE NEST SEAT

NATURE PLAY TILED PUZZLE

GLIDING!

CHALLENGING CLIMBING ASCENTS

1.9M TALL SLIDE!

INCLUSIVE SWINGING

SOCIAL PLAY

DDA COMPLIANT PATH

JUNIOR AREA: 4 -14 YEARS OF AGE

A Y

I N

C

L

L

P

U

E

S I

V

S I

V

This is a concept design only, Actual colours and features may change at any time. This document is protected by copyright and is the property of eibe. It may neither be copied nor duplicated without our written consent. It may not be imparted or made accessible to a third person. A further usage needs the consent of eibe. Unlawful usage is liable to prosecution and is obliged to compensation.

E

U

P

L

L

C

A Y

I N

A Y

I N

C

L

L

P

U

E

S I

V

S I

V

E

U

P

L A Y • I N C L

L

A Y • I N

C

L U

P

E

S I

V

S I

V

E

U

P

L

L

C

A Y

I N

A Y

I N

C

L

L

P

U

E

S I

V

S I

V

E

U

P

L

L

C

A Y

I N

PARENT MINDER BENCH

SHADED PLAY

SENSORY PLAY

SNAKE SPRING ROCKER

SENSORY BUTTERFLY

TACTILE PLAY

VISUAL PLAY

ACCESSIBLE SPINNING

1

SLIDING

ROCKING

BEETLE SPRING ROCKER

SATELLITE CAROUSEL A O

SOCIAL PLAY

CRAWLING

SENSORY PLAY BUTTERFLY A RANGE OF ACCESSIBLE TACTILE AND VISUAL PLAY OPPORTUNITIES ALLOW CHILDREN OF ALL ABILITIES TO PLAY SIDE BY SIDE

TODDLER AREA: 0 - 4 YEARS OF AGE

A Y

I N

C

L

L

P

U

E

S I

V

S I

V

This is a concept design only, Actual colours and features may change at any time. This document is protected by copyright and is the property of eibe. It may neither be copied nor duplicated without our written consent. It may not be imparted or made accessible to a third person. A further usage needs the consent of eibe. Unlawful usage is liable to prosecution and is obliged to compensation.

E

U

P

L

L

C

A Y

I N

A Y

I N

C

L

L

P

U

E

S I

V

S I

V

E

U

P

L A Y • I N C L

L

A Y • I N

C

L U

P

E

S I

V

S I

V

E

U

P

L

L

C

A Y

I N

A Y

I N

C

L

L

P

U

E

S I

V

S I

V

E

U

P

L

L

C

A Y

I N

12

11

10

9

8

7

6

5

4

3

2

1

CHECK DRAWING SCALE

FOUNDATION NOTE: It is important the correct foundation level is used when ordering. FL1: 400mm Standard Leg Use this for standard installation, grass surface, inclined ground, loosefill FL2: 30~110mm Short Leg For Synthetic Surface, installed onto pad

Auto CAD Main Play Area Scaled Technical Layout A Full technical construction Layout will be created in AutoCAD 2021, PDF and DWG files will be made available in hard and soft copies. A1 and A2 sizes will be provided for ease of viewing and printing. All surface areas can be scaled and safety zones can be checked for conformity

H

H

Disclaimer: 1.

This is NOT a construction drawing 2. Images shown are for layout purposes only and may differ from actual product supplied. 3. All installation measurments should be taken from the supplied installation instructions 4. Any discrepancy found between information shown and measurments taken from site should be reported to eibe immediatley 5. Full area measurments are to be checked before installation can proceed 6. Check foundation level requirements for each item GENERAL NOTES If not indicated on this plan, north point must be confirmed prior to installation to ensure that slides do not face due south. Exact positions & orientation of new items may be subject to a final site survey and setting out plan. Any inconsistencies on site should be verified with eibe before commencement of work. eibe recommend that existing trees are risk-assessed by the client to ensure the integrity of accessible branches, that overhanging limbs do not conflict with new play equipment or vehicle access and that the canopy will not produce excessive leaf drop which could cause a hazard within the play area. This design layout conforms to the relevant EN Safety Standard. GRASS & GRASS MAT SURFACING Where equipment is installed directly into grass and the free height of fall is between 0.6m and 1.5m it is the responsibility of the playground operator to ensure that the grass sward is maintained in good order. Where equipment is installed with grass mat surfacing it is the responsibility of the playground operator to ensure that the grass is maintained in good order. When laid directly onto existing grass this surface will follow the natural contours of the ground. RUBBER MULCH SURFACING eibe recommend the use of a 50mm stone base when installing rubber mulch. If installed without the finished surface will be a reflection of the ground beneath it, following any undulations, & will not be a completely flat surface. Rubber mulch will not cure any existing drainage problems & will require foundations and/or some kind of drainage system prior to installation.

G

G

Existing Slide

Grass Matting

Existing Carousel

Jota 20m Cableway

Existing Horse Rocker

F

F

Conceptual Mounds

Luna Swing + Toddler Seats

Relocated Existing Bench

Mantis Climbing Frame

E

E

Snake Spring Rocker

Existing Pathways

Toddler Play House

Stella Seesaw

Rubber Bonded Safety Surfacing

D

D

Luna Swing + Nest Seat

Beetle Spring Rocker

Sensory Butterfly Play Unit

C

C

Satellite Carousel

Drawing Signed Off By:

Date

Monika Bench

THIS DRAWING MUST BE SIGNED OFF BEFORE INSTALLATION CAN PROCEED

A

Rev No.

Date

Revision Description

B

B

eibeplay Ltd, Forsyth's Home Farm, A3 Bypass Road, Hurtmore, Surrey, GU8 6AD

N

A1

Tel: 01483 813 834 Email: eibe@eibe.co.uk

0 1 2 3

4 5

10

09/03/2023 Date

1:100 Drawing Scale

Designer

MF

Customer

Hackleton Play Area Hackleton Parish Council

SCALE 1:100

METRES

A

A

Project

Quote No. Customer No. 60131157 70010465

1 / 1 Revison Sheet

12

11

10

9

8

7

6

5

4

3

2

1

Hackleton Play Area - Hackleton Parish Council / 14

Hackleton Play Area - Hackleton Parish Council / 15

ID Task Name

Duration

Start

Finish

12172227010611162126030813182328020712172227020712172227010611162126010611162126310 ary 2023 February 2023 March 2023 April 2023 May 2023 June 2023 July 2023 Aug

Provisional Time Line We have created a Preliminary Tender Programme to illustrate the timeline associated with the project. All phases are shown as a black line with the constituent sub items below in orange. They are arranged in the order that they will occur and are shown with their start and finish dates. Tender Program

1

Hackleton - Hackleton Recreation Ground (Provisional)

125 days? Wed 25/01/23 Tue 18/07/23

2 3 4 5 6 7 8 9

Tender Phase

59 days? Wed 25/01/23 Mon 17/04/23 1 day Wed 25/01/23 Wed 25/01/23 1 day Wed 25/01/23 Wed 25/01/23 31 days Thu 26/01/23 Thu 09/03/23 1 day? Fri 10/03/23 Fri 10/03/23 20 days Mon 13/03/23 Fri 07/04/23 1 day? Mon 10/04/23 Mon 10/04/23 1 day? Mon 17/04/23 Mon 17/04/23 50 days Tue 18/04/23 Mon 26/06/23 41 days Thu 20/04/23 Thu 15/06/23 50 days Tue 18/04/23 Mon 26/06/23 16 days Tue 27/06/23 Tue 18/07/23 17 days Tue 27/06/23 Wed 19/07/23 2 days Tue 27/06/23 Wed 28/06/23 1 day Tue 27/06/23 Tue 27/06/23 1 day Wed 28/06/23 Wed 28/06/23 14 days Tue 27/06/23 Fri 14/07/23 1 day Tue 27/06/23 Tue 27/06/23 8 days Thu 29/06/23 Mon 10/07/23 4 days Tue 11/07/23 Fri 14/07/23 3 days Mon 17/07/23 Wed 19/07/23 1 day Mon 17/07/23 Mon 17/07/23 1 day Tue 18/07/23 Tue 18/07/23 1 day Wed 19/07/23 Wed 19/07/23 0 days Wed 19/07/23 Wed 19/07/23

25/01

Issue tender documents

Site Visit

Tender Response Development

10/03

Tender Submission

Evaluation of submissions Assumed Contract Award Assumed Contract start

10/04

17/04

10 11 17 18 23 24 25 26 27 28 29 30 31 32 33 34

Planning

Prestart Meetings

Manufacture of Equipment Weekly Progress Meetings

Construction Phase

Site setup

Site Setup - Fencing and compound area

Removal & site preparation

Play Area Installation

Delivery of equipment Installation of Equipment Installation of Surfacing

Commissioning and Handover

Commissioning

Independent Play Inspection

Snagging

19/07

35 Play Area Handover

Task Split

Inactive Milestone Inactive Summary

Finish-only External Tasks External Milestone

Milestone Summary Project Summary

Manual Task Duration-only Manual Summary Rollup

Project: Gantt 1 Date: Thu 09/03/23

Hackleton Play Area - Hackleton Parish Council / 16

Hackleton Play Area - Hackleton Parish Council / 17

Progress Deadline

Materials & Warranties Equipment Guide

Hackleton Play Area - Hackleton Parish Council / 18

Hackleton Play Area - Hackleton Parish Council / 19

Toddler Play House

Luna Swing with Toddler Seats Product Number : 555354025 Materials : Powder coated steel Minimum space : 775x310x316 cm

Product Number : 7000229 Materials : HDPE, Steel Minimum space : 417 x 690 cm Safety Surface Area : 28.7 m² Free falling height : 90 cm Foundations : 1x CF

Safety Surface Area : 23,0 m² Free falling height : 129 cm Foundations : 4x CF

Hackleton Play Area - Hackleton Parish Council / 20

Hackleton Play Area - Hackleton Parish Council / 21

Equipment

Sensory Butterfly Play Unit Product Number : 55985100100 Materials : Steel, HDPE, Pinewood Minimum space : 762 x527 x 200 cm Safety Surface Area : 34.5 m² Free falling height : 20cm Foundations : 1x CF

Hackleton Play Area - Hackleton Parish Council / 22

Hackleton Play Area - Hackleton Parish Council / 23

Little Beetle Spring Rocker

Snake Spring Rocker

Product Number : 5598090 Materials : Powder coated steel Minimum space : Ø 280x240 cm Safety Surface Area : 6,5 m² Free falling height : 40 cm Foundations : 1x CF

Product Number : 5671250 Materials : Powder coated steel Minimum space : Ø 280x240 cm Safety Surface Area : 6,5 m² Free falling height : 40 cm Foundations : 1x CF

Hackleton Play Area - Hackleton Parish Council / 24

Hackleton Play Area - Hackleton Parish Council / 25

Inclusive Nest Swing

Inclusive Nest Spinner

Satellite Carousel

Quadruple Swings With Nest Seat Product Number : 55985100100 Materials : Powder Coated Steel Minimum space : 800 x 772 x 380 cm

Product Number : 5553660 Materials: Galvanized steel, plastic-coated steel cable, PE Minimum Space : Ø 540x258 cm

Safety Surface Area : 50.0 m² Free falling height : 149cm Foundations : 2x CF

Safety Surface Area : 23.0 m² Free falling height : 50 cm Foundations : 1x CF Hackleton Play Area - Hackleton Parish Council / 26

Hackleton Play Area - Hackleton Parish Council / 27

Rocking Play

Social Play

Stella Two-Seater Seesaw

Monika Park Bench

Product Number : 555352024 Materials : Steel Powder Coated Minimum Space : 600x229x280 cm

Product Number : 5598345 Materials : Steel , Composite Minimum space : 200x69x75 cm

Safety Surface Area : 13 m² Free falling height : 100 cm Foundations : 2 x CF

Safety Surface Area : N/A Free falling height : 0 cm Foundations : 4x CF

Hackleton Play Area - Hackleton Parish Council / 28

Hackleton Play Area - Hackleton Parish Council / 29

Play Panels

Product Number : 7001121, 7001112 Materials : HDPE Minimum Space : N/A

Safety Surface Area : N/A Free falling height : N/A Foundations : N/A

Hackleton Play Area - Hackleton Parish Council / 30

Hackleton Play Area - Hackleton Parish Council / 31

Sound Play

Jota Aerial Cableway - 20m

Product Number : 51503413300 Materials : Galvanized Steel Minimum Space : 2850 x 584 x 371 cm

Safety Surface Area : 76.5 m² Free falling height : 80 cm Foundations : 2 x CF

Hackleton Play Area - Hackleton Parish Council / 32

Hackleton Play Area - Hackleton Parish Council / 33

Praying Mantis Climbing Frame

Product Number : 7000230 Materials : Powder Coated Steel Minimum Space : 1236 x 763 cm Safety Surface Area : 68,6 m² Free falling height : 219 cm Foundations : 2 x CF

Hackleton Play Area - Hackleton Parish Council / 34

Hackleton Play Area - Hackleton Parish Council / 35

Case Studies

Hackleton Play Area - Hackleton Parish Council / 36

Hackleton Play Area - Hackleton Parish Council / 37

Case Study Jubilee Park Play Area

Client:

Value:

Havant Borough Council

£100,000

Start Date 10th June 2022

Completion Date: July 2022

Contact:

Title

Mathew Tyler

Parks Officer

email

matthew.tyler@havant.gov.uk Phone

Jubilee Park is situated in the heart of Waterlooville, Hants, and is a well-used and loved playing field. The playing fields are often used for community events and are also home to a MUGA, Skate Park and numerous sports clubs such as Bowls and Cricket. Havant Borough Council has previously preferred to use metal play equipment for their play spaces due to past experiences using timber. However, in 2021 eibe Play arranged site visits of three play spaces around Fareham with the Park Officers for Havant Borough Council. Fareham Borough Council installed these play spaces over two years, which previously had the same opinion. All three of these destinations play spaces have been

a great success and changed Fareham Borough Councils’ mindset on the quality and durability of timber play equipment. After visiting these play areas with eibe Play and speaking to the council members from Fareham Borough Council, the council saw the quality. It felt the durability was suitable for both parties to feel confident enough for eibe Play to tender for any of their play area refurbishment schemes. A few months passed, and then eibe Play received the tender paperwork for the exciting redevelopment of the Jubilee Park Play Area. We were highly excited to tender for this scheme, and after a site visit, to better understand the requirements and the playing space as a whole, eibe Play started the design stage of the tender submission. We felt this play area, especially the local community, deserved a WOW factor play area to fit in with the destination feel for the rest of the park. This was at the forefront of our minds with the initial design work. We also thought that the play area needed to represent elements of the nature found around the park, which would help with the theme of the play area and educate the local children. However, this can be seen

all around the play area, with the theming within the wet pour surface. The play area also needed to be inclusive and include play equipment that children of all abilities can use. The play equipment eibe Play has chosen for this play space included elements designed for reasonable access for all users; however, it also allowed all children to play together without being singled out. This can be seen in particular with the inclusion of the Inclusive Floor Roundabout and the Play Unit Lauren which has an accessible ramp leading up to the main platform, surrounded by play panels. Another critical factor when designing any play space is accessibility for all users. Therefore, we have created all the play equipment accessible via a hard-standing surface. Which also helps the equipment to be used all year round. In February 2022, eibe Play was excited to hear the news that we had been awarded the contract for the refurbishment of Jubilee Park Play Area. The work commenced in April 2022, with a predicted finish date of the May bank holiday weekend. With much hard work, we managed to meet this deadline, where

the play area was opened to many excited children keen to use the great new play equipment the play space had to offer. eibe Play was keen to support the council and the Friends of the Park group to create a grand opening worthy of this great new play space. Therefore, eibe Play donated balloons, ribbons, bunting and goodie bags for the first children to use the play area. Eibe Play is looking forward to a fantastic working relationship with Havant Borough Council to ensure the play space is a success and well-loved by the local community for years to come.

Hackleton Play Area - Hackleton Parish Council / 38

Hackleton Play Area - Hackleton Parish Council / 39

Case Study Larkfield

Client:

Budget:

Adur and Worthing Councils

£100,000

Start Date:

Completion Date:

11th December 2023

21st January 2023

Contact:

Title:

Craig Ifield

Ranger

email:

Phone:

craig.ifield@adur-worthing.gov.uk

Adur and Worthing Council and eibe Play share a fantastic relationship and have previously worked on various play spaces across Worthing, including Tarring Park and Gull Island. The play area is located right next to a primary school and surrounded by residential streets, so it is a popular destination for the local community. Families frequently use the fields surrounding the play area for picnics, dogwalkers and community events. The design brief from the council was to ensure the play areawas accessible for all and to include play features for children aged 2-12 years old. Due to the extremely high water table on site, the council also wanted to ensure that the play area was accessible all year round. They also wanted to ensure easy access for prams and wheelchairs throughout the play space. Due to the play areas’ extreme proximity to the seafront, eibe Play chose to go with a sea theme throughout. They also took elements of their existing catalogue and adapted them to fit the play space’s theme. For example, specific play panels and slides were manufactured to be blue to help support this theme. The pathway leading to the play space was also given a makeover, with a brand new wet pour surface leading from one gate to another. When designing the play space, eibe Play wanted to include the right amount of play value and features for children of all ages. For example, toddlers need to discover and test themselves on a climbing unit that offers them various play opportunities, such as climbing and sliding. This, in some instances, will be their first experience of climbing and sliding, therefore developing essential skills such as lower and upper body coordination. For this, we chose our Play Unit K2, which we dressed up to resemble a seaside cottage. Once they grow older and want to develop their skills further, they can move on to our adapted Climbing Unit, Ben Nevis, which has various challenging crossings and ways to get off and onto the unit. It also has an excellent and unique Broad Slide. The Ben Nevis is designed for children aged 5 to 12 years. Surrounding these fantastic items, eibe Play chose various other challenging and fun play options such as the Stand Up Carousel, Fisher Rockers, Snake Swing and multiple swings. Eibe Play needed to design this space as inclusive as possible. To help aid this already fully accessible play space, eibe Play included their brand new Wheelchair Seesaw. This, as well as the Broad Slide, various sea-themed play panels and the eibe Nest Swing seat, eibe Play believe they have chosen the right amount of play equipment that makes this play space accessible for all.

As previously mentioned, the play area’s safer surfacing has been designed to ensure it’s fully accessible all year round. This was a significant part of their design thinking process. The design includes an entire wet pour surface laid over the existing surfacing in most areas. This allows us to provide an environmentally friendly option, as there will be no to take materials off-site for refuge. This follows eibe Plays, environmentally green ethos. After the council went through a consultation stage with the local community,eibe Play was privileged to be awarded the play area refurbishment contract. They quickly engaged with the council o refine the play equipment chosen, and after a couple of minor amendments, the manufacturing of the equipment commenced. The play area was opened by the council in time to be enjoyed by the children over a gloriously sunny winter’s weekend, and the initial feedback we have received has been very positive. eibe Play hope that Larkfield Play Area will be loved and well- used by local children for years to come!

Hackleton Play Area - Hackleton Parish Council / 40

Hackleton Play Area - Hackleton Parish Council / 41

Case Study Heath Park

Client:

Value:

Cardiff Council

£42000 30/1/23

Start Date:

Completion Date:

23/1/23

Contact:

Title:

Kate Blair

Parks

email:

Phone:

Kate.Blair@Cardiff.gov.uk

Cardiff Council contracted eibe play Ltd to provide a replacement multi-play unit in Heath Park, which had sustained severe and unrepairable damage through anti-social behaviour. The existing play unit, installed by eibe play 15 years ago, was a well-known attraction within Heath Park, with the council wishing to replace it with a similar statement item of play. Working with the Council, a new, improved multi-play unit, The Extron, featuring multiple accents, descents, climbing and balancing challenges, was decided upon as the ideal replacement unit. Designed for junior age groups six years +, The Extron provides multiple challenges and play values, at height and on the ground, to allow children to build confidence in their abilities. To enhance the equipment further and prevent future damage from anti-social behaviour, it was agreed that eibe would supply the unit with steel powder- coated posts. Installation involved the removal of the original existing bark safety surface to allow the removal of the actual play unit and its foundations. Our local installation team laid new foundations, and the new Extron unit, the original bark safety surface, was re used.

Hackleton Play Area - Hackleton Parish Council / 42

Hackleton Play Area - Hackleton Parish Council / 43

Materials & Warranties

Hackleton Play Area - Hackleton Parish Council / 44

Hackleton Play Area - Hackleton Parish Council / 45

Steel Play Equipment

Play units must withstand high usage and stress. Metal materials are ideal in this situation to construct highly durable, easy to clean and safe play areas. With our metal products, eibe presents imaginative metal worlds that look sturdy, yet are extremely attractive. With their timeless design, the basic units are a perfect match for all types of terrains.

A Key Point Summary

• Interesting colour designs intrigue children

• Metal materials are highly durable, easy to clean and safe to play areas

• Stainless steel, galvanised steel and powder-coated options available

• Low cost of ownership thanks to easy-care concept

• Can withstand high usage and stress

• Large variety of individual component parts to design a play world

• Extremely attractive

• 100% recyclable after product lifecycle

High-quality joinery is a key characteristic of all eibe play equipment

Our many years’ experience in building play equipment is evident from the quality of the joinery and the detailed, sophisticated design.

Stainless Steel

Galvanised Steel

Powder Coated

Materials Overview

Stainless Steel: V2A stainless steel (1.4301) Corrosion resistant, temperature resillient, conductive, weldable, hygienic, lowmaintenance, long life, long guarantee

Steel: (S235JR)

All parts are carefully processed, deburred and surface treated depending on requirement

Small parts are galvanically zinc plated Larger parts are hot dip galvanised and powder coated if required

Hackleton Play Area - Hackleton Parish Council / 46

Hackleton Play Area - Hackleton Parish Council / 47

HDPE

High Density Polyethylene

HDPE

• UV stabilized for fade resistant outdoor use • Will not rot, delaminate, splinter or crack • Stain and graffiti resistant for easy cleaning

• Durable orange peel textured finish • Moisture and chemical resistant • High impact resistant • 100% recyclable and non toxic • Easily machined and engraved • No heavy metals • No phthalates

High Density Polyethylene (HDPE) sheets are extruded and co-extruded thermoplastic materials that are used worldwide in the manufacture of panels and components for the Playground, Sport, Leisure and Recreation Industries. The versatile properties of this material, including UV stability, make it resistant to fading, moisture, weather, stain and graffiti. The perfect choice for outdoor environments. HDPE is easily routed or engraved using current CNC technology, in the case of 2-colour sheet options, you can remove the outer colour and revealing the colour inside to create almost unlimited design capabilities. Increasingly used across a wide range of industries and applications, HDPE panels are being used to replace timber and composite panel components. Whilst the initial cost of these materials may be lower, the long-termmaintenance requirements and shorter life expectancy make their choice a false economy. HDPE also offered as softer, warmer and more play friendly feel to it. In addition to all the product and user benefits, HDPE is 100% recyclable

Hackleton Play Area - Hackleton Parish Council / 48

Hackleton Play Area - Hackleton Parish Council / 49

Surfacing Rubber Bonded

Tested and compliant with EN1177 (certificate available upon request) Rubber Bonded Mulch is:

• Highly Slip Resistant • Fire Retardant • Impact Absorbing • Porous • High Durable • Versatile • Colour Variations (allowing for Theming and to suite the site context)

Rubber Mulch - A unique process that starts with recycling solid rubber that otherwise would go to landfill; consistent control of this process provides us with a carefully blended flat shred, which is then coloured with our unique encapsulation process that not only gives us a natural looking surface, but one that is soft and flexible, long lasting and bonds perfectly. Binder - A specially developed PU binder that is designed to work in cooperation with the shred size, the colouring process, and the requirements of a strong, yet flexible bond. This mixture is then simply spread out with a trowel. As this bonded shred system is self-supporting it requires no digging of foundations and the lack of large or heavy equipment makes it cost effective for even small or difficult access areas. Moreover it will easily work directly onto almost any existing ground conditions including grass or soil, old tiles or wet pour, crushed aggregate or concrete; it will follow the natural sloping contours of the ground and / or absorb undulations and can even be spread directly over tree roots and around plants.

Hackleton Play Area - Hackleton Parish Council / 50

Hackleton Play Area - Hackleton Parish Council / 51

Grass Matting Surfacing

An environmentally friendly, non slip impact absorbing safety and foot way surface.

The Rubber Grass Mat is our most versatile product with a multitude of uses in commercial environments. Rubber Grass Mats are designed to protect the ground and grass from becoming churned up and muddy; the ring-hole form allows grass to grow back through the mat, preserving the green and fresh look of your lawn! They are extremely easy to install using our pegs and cable ties; just fix into the ground using the pegs and attach each mat using the cable ties. Our Rubber Grass Mats are manufactured to the highest quality and standards using recycled rubber. We inspect each item before shipping to ensure that you receive only the best, and most effective, ground protection products. • Moulded non-slip cellular structure with excellent durability and comfort • No costly base works (as required for conventional tiles for wet pour) • Ideal for green eld sites, disappears from view once turf has re-grown • Can be used on at or contoured landscapes • Suitable for all weather, extreme temperatures and resists wind uplift • Tested to BS EN 1177:1998 3 Metre Critical Fall Height Wheelchair and pushchair accessible • 25mm holes in Rubber grass mats allow efficient drainage • Maintenance free • Can be laid on flat or contoured surfaces • Manufactured from recycled rubber • Wheelchair Friendly Maintenance: • The Matting solution is maintenance-free, keeps grassed areas looking neat and allows the grass to be cut with a conventional mower • Absorbs Shock and noise • Critical fall height of 3 meters, tested by RAPRA • Protects oor and equipment, Added protection for grass

Hackleton Play Area - Hackleton Parish Council / 52

Hackleton Play Area - Hackleton Parish Council / 53

Brightening up older play units Repainting

Older metal play equipment may look out of date or have a requirement to be replaced, however if the structure is still sound and the inspection report states it meets the requirement of BSEN1176 it might be well worth keeping it in place and giving it a new lease of life with a fresh coat of paint. When done corectly it could give the item of play another 10 years of life. Our Process Paint children’s playground equipment with lead-free paint to prevent lead poisoning. Children’s metal playground sets are typically constructed of galvanized steel to prevent rusting. Before painting playground equipment, carefully inspect the equipment and make needed repairs. Because welding melts the zinc coating of the galvanized steel, properly prepare any newly welded areas before painting. Check wooden playground sets for splinters and make the proper repairs before painting. Select paint for use on playground equipment carefully. Ask your paint dealer for advice. Follow manufacturer’s instructions carefully. Painting Metal Playground Equipment Step 1 Restore zinc coating to any welds made to repair play equipment. Sandblast or wire brush the weld to remove slag, then coat the welded area with a zinc-rich paint. Zinc-rich paint is available in spray cans or containers for brush painting. Step 2 Clean the play equipment with warm, soapy water. Use a terry cloth rag to wash all surfaces. Make certain to remove all dirt and grease. Rinse thoroughly with clear water. Step 3 Allow the metal play equipment to dry thoroughly. Joints between metal pipes and bars take longer to dry. Make certain all surfaces are completely dry before proceeding. Step 4 Sand all surfaces using 280- to 320-grit sandpaper. Wipe surfaces with a clean cloth to remove paint dust. Using the correct sandpaper here will give you the best finish. Step 5 Apply a thin primer to ensure a good paint bond. Follow manufacturer’s instructions to brush or spray the primer onto play equipment surfaces. Step 6 Paint with exterior-grade, lead-free paint. Follow manufacturer’s instructions. A few coats may be required, this will be depanent on the choen colour.

Hackleton Play Area - Hackleton Parish Council / 54

Hackleton Play Area - Hackleton Parish Council / 55

Sustainability

• As a result, eibe is recognised, independently tested and certified to ISO 9001 and 14001 for its Quality and Environmental Management Systems. • Using only FSC Certified Timbers and treating them with the eco friendly process of pressure impregnation. Ensuring that the chemicals used in the manufacturing process are non-harming, and furthermore ensure that at the end of all eibe equipment life it can be disposed of without harming the environment. • We are also certified under the Eco-Management and Audit Scheme (EMAS) to ensure we maintain and our environmental performance. • In 2016 we were presented with two Green Apple awards for Environmental Best Practice and appointed as International Green World Ambassadors at a ceremony at the Houses of Parliament. • We select materials to ensure minimised though life maintenance and sustainable disposal at the end of its life. eibe is committed to sustainability by reducing its Ecological footprint and Carbon Emissions, compliance with relevant legislation and undertakes to do whatever it can in order to ensure this happens.

“The Green World Ambassador status is one we embrace and utilise fully. From sustainable manufacturing to partnering with like-minded businesses, we will continue to invest in our Corporate Social Responsibilities in the years ahead.” - Paul Redden, Managing Director, eibe Play UK

Hackleton Play Area - Hackleton Parish Council / 56

Hackleton Play Area - Hackleton Parish Council / 57

Protecting the Future Environment

Through our award-winning Corporate Social Responsibility ethos, eibe is a true ‘environmental protection pioneer’. For over twenty years, sustainability has been an integral part of our business strategy, from wood production to catalogue printing, with a host of certificates and award recognition to support it. eibe protects the environment • Our wood comes from sustainable forestry, 100% guaranteed, FSC® certified (COC) • Environmental protection is deeply anchored in our corporate philosophy • Exemplary ‘green’ management and environmentally compatible products • Ecological-centric production procedures • Consistent and continual fair thinking and empathetic action FSC: The FSC trademarks on wood and wood products stand for transparency and credibility. They guarantee fair and responsible treatment of people and the environment. EMAS: EMAS is a voluntary instrument of the European Union. It advises and accompanies businesses and organisations of every size and branch to continuously improve their environmental performance. UMWELTPAKT BAYERN: The Bavarian Environmental Pact is an agreement between the Bavarian government and the Bavarian industry.

eibe and sustainability All of the wood we use originates from sustainable forestry.

Just like our finished products, the timber is rigorously tested and certified.. Voluntariness, acceptance of environmental responsibility and cooperative action are parts of the basic principles. Currently over 2600 businesses are involved in the Bavarian Environmental Pact for sustainable economic activity.

Hackleton Play Area - Hackleton Parish Council / 58

Hackleton Play Area - Hackleton Parish Council / 59

Installation Play Equipment Instructions

“Did you know our foundations are 400mm “deep?

All eibe equipment comes with it’s own unique set of installation instructions these not only guide the installers to make sure the equipment is installed exactly as it was to get it’s TUV certificate but also to number and label every part of the unit for easy effective installation. This means ordering spare parts is a quick and effective even if the product is modified over time. The installation instructions always remain unique to you.

Summary: A full set of installation instructions will be provided for this project. Includes full installation procedure All parts have unique code identifier Various foundation and fixing methods provided Scope of delivery Maintenance guide Details on warranty and parts guarantees Guidance on wood protection Elevation and plan views Proof of maintenance sheet The Team: We aim to use our own installation teams for all our groundwork’s playground installations, this means we can keep tight control over standards and quality issues. Regular training is provided from changes to the HSE to important updated from the British Standards. It is key for us to provide and up to date installation method leaving a clean bill of health from the independent inspection.

5 59 151 5

Foundation plan showing in-situ concrete footings made from C20/25 concrete. (Leave foundations to harden for at least 14 days before mounting the equipment.)

Impact-attenuating surface according to EN 1176: for outdoor playground equipment only!

Scope of delivery • Ground work • Assembly • Maintenance Article pass / Guarantee certificate

Play ship Santa Maria 5 59 151 5 0028

4.

5 59 151 5

1x G 51 307 3 -SF 1x G 51 509 3 -SF 10b K 50 408 0 - 74° G 51 509 3 1x G 51 510 3 -SF 10c K 50 408 0 - 74° 5 G 51 510 3 1x G 51 513 0 G 51 513 0 1x G 51 513 3 -SF 14b K 50 401 0 - 90° G 51 513 3 1x G 51 516 0 G 51 516 0 1x G 51 518 0 G 51 518 0 3x G 51 360 0 K 50 408 0 - 74° G 51 307 3

K 48 002 0 - PA6 S 01 155 6 - 5,0 x 70

K 53 021 0

S 30 103 1 - DIN603 - M12 x 200 K 50 161 0 - M12 S 08 056 0 - M12 x 60

G 51 516 0

G 51 513 0

S 08 056 0 - M12 x 60

G 51 518 0

5 59 151 5

K 50 054 0

G

1:100

Attention: Guarantee Keep these documents in a safe place. Please indicate the workshop order number (RM-Nummer) in all inquiries and complaints. RM-Nummer: jedoch farbig but painted package circular 2x K 59 001 0

G

S 30 092 1 - M12 x 90 - DIN603

0,0m

1,0m 2,0m 3,0m

Please allow for a distance to other objects of at least 1.5 m all around the equipment (EN 1176). This area must be absolutely free of hard or sharp-edged or protruding parts a child could fall onto.

G 51 513 3 -SF

1x F 56 081 0

K 50 161 0 - M12

1x K 55 383 0

= impact area

10/45

G 51 360 0

No: UK-1411-V-10

3x K 53 021 0

4x G 51 531 0

G 51 510 3 -SF

1x F 56 080 0

G 51 509 3 -SF

2 0, 0 m

1x G 51 371 0

S 01 177 0 - 10 x 120 G 51 307 3 -SF

1x K 55 552 0

1x B 20 235 0

2x K 50 340 0

23/45

1x K 55 556 0

2x 5 59 368 0

1x 5 59 366 0

1x 5 59 365 0

1x K 55 441 0

1x G 51 550 0

1x G 51 549 0

1x G 51 548 0

4x F 50 334 0

Independent inspection: All our playgrounds get inspected by a member of the RPII, this is the register of inspectors international, very much like RoSPA which is available on request as an alternative play inspection body.

17/45

Part subject to wear (not part of our warranty)

Hackleton Play Area - Hackleton Parish Council / 60

Hackleton Play Area - Hackleton Parish Council / 61

Our Installation Team Quality install and after-care

On successful award of tender eibe will plan in the installation with our premium installation team RP Bayliss Groundwork

Our Installer: Ryan is our most senior installer and has worked on 100’s eibe playground installations over the last 15 years. Ryan has set his own high standards to work to and along side our expectations we can guarantee a safe, secure and conforming playground installed to the specifications set.

Ryan

Lyme Regis

Cobtree Manor

Colchester Zoo

Quality: Regular training is provided including changes to the HSE to important updates from the British Standards. It is key for us to provide and up to date installation method leaving a clean bill of health from the independent inspection. Geographical Restrictions: In certain circumstances it may be viable to source local contractors for your installation. We pride ourselves on transparency and clarity and are happy to provide references and examples of work for all of our installation teams.

Middle Park, Brighton

Hackleton Play Area - Hackleton Parish Council / 62

Hackleton Play Area - Hackleton Parish Council / 63

Insurance Letter

Hackleton Play Area - Hackleton Parish Council / 64

Hackleton Play Area - Hackleton Parish Council / 65

Guarantees & Spare Parts

eibe Playground Equipment: Guarantee Cover Time Wood

Metal

35 Years 15 Years.

Steel Structural Elements Guarantee for decomposition and fungal decay for all robinia timber, all oil glued laminated larch, all pressure

Steel Structural Elements

Guarantee for non- corrosion of stainless steel, galvanised, and powder coated construction elements.

impregnated softwood timber, and oiled glued laminated eucalyptus

5 Years 2 Years

Guarantee for breaking and malfunction caused by construction, workmanship and material selection Guarantee for malfunction and breaking for moving parts, bearings, springs and nets (Wear and Tear).

Playground Safety Surfacing: Time Guarantee Cover 5 Years

For all EPDMWetpour safety surfacing, Rubber Grass Matting and Rubber Bonded Mulch

5 Years

For all Play Bark and Wood Chip, Play Grade Sand

Other: Time

Guarantee Cover

1 Year

Covering all workmanship elements including concrete foundations, and hard and soft landscaping i.e. planting, mounding etc.

Terms of Guarantee

Availability of Spare Parts

Please note that the Guarantee period will commence following completion and contract sign-off. For guarantees to remain in effect for their duration the Customer has a responsibility to adopt a suitable maintenance regime for all aspects of the play environment (please see eibe’s recommended maintenance below). All inspection and maintenance undertaken by the Customer, or by others on the Customer’s behalf must be recorded, detailed and documented. Maintenance records will be requested when a claim against eibe’s guarantees are made. Where inspection and maintenance records cannot be produced then eibe will not be responsible for honouring the guarantees offered. On the basis that recorded inspection and maintenance documentation can be produced then eibe will uphold the guarantees offered.
Misuse of any aspects of equipment or the play environment, acts of vandalism/anti-social behaviour, or general wear and tear through frequent use is not covered by the guarantees.

Spare parts are made available for the life of all eibe equipment, whether the requirement is to replace a single element or an entire unit.

With respect to the lead times associated with spare parts, these are as follows:

• 24/48hrs – For standard screws and fixings etc. • 1 Week – For elements such as swing seats, connection elements, ropes etc. • 3 Weeks – For structural posts, slides etc.

Hackleton Play Area - Hackleton Parish Council / 66

Hackleton Play Area - Hackleton Parish Council / 67

Made with FlippingBook - professional solution for displaying marketing and sales documents online