St Richards Open Space Presentation
St Richards Open Space Wychavon District Council
Two Seater Seesaw 5550905
St Richards Open Space Wychavon District Council 3 4
AGE RANGE 0 - 14
7
6
5
2
1
GLIDING PLAY
INCLUSIVE PLAY
60 + USERS
1 H CHECK DRAWING SCALE Disclaimer: 1. This is NOT a construction drawing 2. Images shown are for layout purposes only and may differ from actual product supplied. 3. All installation measurments should be taken from the supplied installation instructions 4. Any discrepancy found between information shown and measurments taken from site should be reported to eibe immediatley 5. Full area measurments are to be checked before installation can proceed 6. Check foundation level requirements for each item 2 3 F G H CHECK DRAWING SCALE Disclaimer: 1. This is NOT a construction drawing 2. Images shown are for layout purposes only and may differ from actual product supplied. 3. All installation measurments should be taken from the supplied installation instructions 4. Any discrepancy found between information shown and measurments taken from site should be reported to eibe immediatley 5. Full area measurments are to be checked before installation can proceed 6. Check foundation level requirements for each item 10 METRES Beginners Walk 5553255 G 1 GRASS & GRASS MAT SURFACING Where equipment is installed directly into grass and the free height of fall is between 0.6m and 1.5m it is the responsibility of the playground operator to ensure that the grass sward is maintained in good order. Where equipment is i stall d with grass mat surfacing it is the responsibility of the playground operator to ensure that the 2 3 A B overhanging limbs do not conflict with new play equipment or vehicle access and that the canopy will not produce excessive leaf drop which could cause a hazard within the play area. This design layout conforms to the relevant EN Safety Standard. C eibe recommend that existing trees are risk-assessed by the client to ensure the integrity of accessible branches, that D GENERAL NOTES If not indicated on this plan, north point must be confirmed prior to installation to ensure that slides do not face due south. Exact positions & orientation of new items may be subject to a final site survey and setting out plan. Any inconsistencies on site should be verified with eibe before commencement of work. E 14/02/2023 Date MO St Richards Open Space Wychavon District Council 1 / 1 Rev No Sheet Designer A1 A:\eibe play Ltd\Photos - Documents\logos\4-colour\eibe-4c_WordBrand.jpg Quote No. Project 1:100 Drawing Scale Rev No. A Date Revision Description eibeplay Ltd, Forsyth's Home Farm, A3 Bypass Road, Hurtmore, Surrey, GU8 6AD Tel: 01483 813 834 Email: eibe@eibe.co.uk Drawing Signed Off By: Date THIS DRAWING MUST BE SIGNED OFF BEFORE INSTALLATION CAN PROCEED Customer No. 10008993 Customer GENERAL NOTES If not indicated on this plan, north point must be confirmed prior to installation to ensure that slides do not face due south. Exact positions & orientation of new items may be subject to a final site survey and setting out plan. Any inconsistencies on site should be verified with eibe before commencement of work. eibe recommend that existing trees are risk-assessed by the client to ensure the integrity of accessible branches, that overhanging limbs do not conflict with new play equipment or vehicle access and that the canopy will not produce excessive leaf drop which could cause a hazard within the play area. This design layout conforms to the relevant EN Safety Standard. GRASS & GRASS MAT SURFACING Where equipment is installed directly into grass and the free height of fall is between 0.6m and 1.5m it is the responsibility of the playground operator to ensure that the grass sward is maintained in good order. Where equipment is installed with grass mat surfacing it is the responsibility of the playground operator to ensure that the grass is maintained in good order. When laid directly onto existing grass this surface will follow the natural contours of the ground. RUBBER MULCH SURFACING eibe recommend the use of a 50mm stone base when installing rubber mulch. If installed without the finished surface will be a reflection of the ground beneath it, following any undulations, & will not be a completely flat surface. Rubber mulch will not cure any existing drainage problems & will require foundations and/or some kind of drainage system prior to installation. 60131099 E F
0 1 2 3
4 5
10
12
11
10
9
8
7
6
5
4
FOUNDATION NOTE: It is important the correct foundation level is used when ordering. FL1: 400mm Standard Leg Use this for standard installation, grass surface, inclined ground, loosefill FL2: 30~110mm Short Leg For Synthetic Surface, installed onto pad
CLIMBING PLAY
H
Leda Carousel 54511506300
SCALE 1:100
METRES
0 1 2 3
4 5
5
30 M LONG CABLEWAY
SCALE 1:100
1
ELIZABETH’S CASTLE
G
SOCIAL PLAY
INCLUSIVE PLAY
6
4
Two Seater Seesaw 5550905
F
Floor Trampoline 1.5 x 1.5 m 5621000
Beginners Walk 5553255
7
6
30M LONG CABLEWAY TWO SEATER SE SAW
Leda Carousel 54511506300
1
E
2
SPINNING PLAY
1.5 x 1.5 M FLOOR TRAMPOLINE
2
SWINGING PLAY
Floor Trampoline 1.5 x 1.5 m 5621000
Two Seater Seesaw 5550905
3
D
Terracombi Play Course 51001801100
Terracombi Play Course 51001801100
INCLUSIVE PLAY
Beginners Walk 5553255
8
C
7
LEDA CAROUSEL
Eagle Quadruple Swing with Nest seat & swing seats 52509001100
170 m2 of Rubber Bonded
3
EAGLE QUADRUPLE SWING & NEST SWING druple Swing with Nest seat & swing seats 52509001100
Elizabeth's Castle 51198900958
146 m2 of Grass Matting
BALANCE
Tardo 30 M aerial cableway 54512506300 Leda Carousel 54511506300
B
170 m2 of Rubber Bonded
5
N
A Elizabeth's Castle 51198900958
BALANCE
SOCIAL PLAY
146 m2 of Grass Matting
12
11
10
9
8
7
6
5
4
•
A Y
I N
C
L
P
L
U
E
S I
V
S I
V
E
U
P
L
L
C
A Y
I N
•
•
A Y
I N
This is a concept design only, Actual colours and features may change at any time. This document is protected by copyright and is the property of eibe. It may neither be copied nor duplicated without our written consent. It may not be imparted or made accessible to a third person. A further usage needs the consent of eibe. Unlawful usage is liable to prosecution and is obliged to compensation.
C
L
L
P
U
E
S I
V
S I
V
8
E
U
4
P L
L A Y • I N C L
A Y • I N
TERRACOMBI PLAY COURSE
BEGINNERS WALK
C
L
P
U
E
S I
V
S I
V
E
U
P
L
L
Tardo 30 M aerial cableway
C
A Y
I N
•
•
A Y
I N
C
L
L
P
U
E
S I
V
S I
V
E
U
P
L
L
C
A Y
I N
•
ELIZABETH CASTLE UNIT
MULTI PLAY
LOOKOUT TOWER
SENSORY PLAY PANEL
EXTRA WIDE SLIDE
ROPE BRIDGE
INCLUSIVE PLAY
THEMED PLAY PANEL
INCLUSIVE WHEELCHAIR RAMP
DRAW BRIDGE
CLIMBING PLAY
SLIDING PLAY
ST GEORGE’S CASTLE UNIT
ALTERNATIVE CASTLE OPTION
2.95 METRE TALL TUBULAR SLIDE
THEMED PLAY PANEL
VARIOUS CLIMBING ASCENTS
DRAW BRIDGE
SLIDING PLAY
MULTI PLAY
CLIMBING PLAY
1.45 METRE SLIDE
Price Breakdown
Play Equipment
£61,396.93 £3,075.65 £58,437.28
Discount
Project Management & Consultation
Final Value
12 Months Visual Inspections
Handover Pack
Maintenance Training
All items as shown above including fixings, ground anchors, installation instructions and TUV conformity Surfacing
20,796.40
Wetpour, Bonded bark and Grass Matting.
Preliminaries
£4188.88
•
A Y
I N
C
L
P
L
U
E
S I
V
S I
All plant required for the installation including a suitable size digger and dumper, temporary Heras fencing for site compound, welfare facilities including toilet and storage. Installation Includes all labour for the installation of the equipment above, all concrete, fixings, muck away and making good and Landscaping. Delivery Everything included to delivery from the factory in Germany or local UK suppliers to site address or storage yard. Torx Set
V
E
U
P
L
L
C
A Y
I N
•
•
A Y
I N
C
L
L
P
U
E
S I
V
S I
V
£18,480.00
E
U
P
P L A Y • I N C L
L
A Y • I N
C
L
U
E
S I
V
S I
V
E
U
P
L
L
C
£6,128.09
A Y
I N
•
•
A Y
I N
C
L
L
P
U
E
S I
V
S I
V
E
U
P
L
L
C
A Y
I N
•
Site Opening Package
Inclusive Assessment Local Planning Consultation
£30.00
• Quotation Number: 60131099 • Site Name: St Richards Open Space • Customer: Wychavon District Council • Customer Number: 10008993 • Quotation date: 17/02/2023 • Valid To: 17/03/2023 • Our Reference: 60131099-Q1-MO
Payment Terms
Payment for equipment & delivery to be issued a minimum of 2 weeks before the start of the installation program. Payment for 75% of the surfacing, preliminaries & installation costs to be issued 1 week into the installation program.
Total Price: £ 108,060.65 Includes a Discount of £3,075.65
Remaining payment on completion of the installation.
Case Study Abbey Meadows Play Area
Client:
Value:
Fareham Borough Council
£106,224.00
Start Date Contact:
Completion Date: 07/07/2021
17/05/2021 Emma Watts
Title
Parks Officer 01323449415
Phone
ewatts@fareham.gov.uk
Fabulously located along the A27 on Southampton Hill next to Titchfield Abbey in Fareham. Abbey Meadows story started back in 2018 with the council looking to install a brand-new natural style play area ranging equipment for different ages and abilities. Following a consultation, the residents and young people took part in an online game where they had the chance to pick the equipment they would like to be installed. As a result of the Covid-19 pandemic, the work on preparing the site
area was delayed; therefore, the project began in 2021 and was opened to the public by the Mayor of Fareham Councillor, Mrs Pamela Bryant, on Wednesday 7th June 2021. This new play area has been designed with the full consideration of the history of the 16th century ‘Titchfield Abbey’ and complements the surroundings of the park’s location. eibe play is also proud to have designed and installed the council’s two other destination play areas at Holly Hill and Daedalus Common. The new Abbey Meadows play area features a range of equipment for all ages and abilities, including a multi-climbing unit themed bespoke by the designers at eibe play, which is suitable for children with reduced mobility, meaning all
children will be able to experience play and have fun together. eibe worked closely with the council to ensure the play area was functional, adventurous but still challenging and safe, which is essential for a child’s development. Alongside the junior castle play unit, eibe installed a nest swing, junior and toddler swings, rockers and a snake swing which are all situated on top of a bonded rubber mulch surface. Executive Member for Leisure and Community, Cllr Sue Bell, said: “This play area will be a huge benefit for the local community and visitors to Titchfield. It is incredibly important that children of all abilities can play together, so the large multi-climbing unit allows children with reduced mobility to come and play with their friends. “I would like to thank the residents of Titchfield and the Titchfield Village Trust who were involved in the consultation process and particularly the children from Titchfield Primary School who shared their ideas and helped us. I would also like to thank Eibe Play for coming up with this fantastic design.”.
Case Study Larkfield
Client:
Budget:
Adur and Worthing Councils
£100,000
Start Date:
Completion Date:
11th December 2023
21st January 2023
Contact:
Title:
Craig Ifield
Ranger
email:
Phone:
craig.ifield@adur-worthing.gov.uk
Adur and Worthing Council and eibe Play share a fantastic relationship and have previously worked on various play spaces across Worthing, including Tarring Park and Gull Island. The play area is located right next to a primary school and surrounded by residential streets, so it is a popular destination for the local community. Families frequently use the fields surrounding the play area for picnics, dogwalkers and community events. The design brief from the council was to ensure the play areawas accessible for all and to include play features for children aged 2-12 years old. Due to the extremely high water table on site, the council also wanted to ensure that the play area was accessible all year round. They also wanted to ensure easy access for prams and wheelchairs throughout the play space. Due to the play areas’ extreme proximity to the seafront, eibe Play chose to go with a sea theme throughout. They also took elements of their existing catalogue and adapted them to fit the play space’s theme. For example, specific play panels and slides were manufactured to be blue to help support this theme. The pathway leading to the play space was also given a makeover, with a brand new wet pour surface leading from one gate to another. When designing the play space, eibe Play wanted to include the right amount of play value and features for children of all ages. For example, toddlers need to discover and test themselves on a climbing unit that offers them various play opportunities, such as climbing and sliding. This, in some instances, will be their first experience of climbing and sliding, therefore developing essential skills such as lower and upper body coordination. For this, we chose our Play Unit K2, which we dressed up to resemble a seaside cottage. Once they grow older and want to develop their skills further, they can move on to our adapted Climbing Unit, Ben Nevis, which has various challenging crossings and ways to get off and onto the unit. It also has an excellent and unique Broad Slide. The Ben Nevis is designed for children aged 5 to 12 years. Surrounding these fantastic items, eibe Play chose various other challenging and fun play options such as the Stand Up Carousel, Fisher Rockers, Snake Swing and multiple swings. Eibe Play needed to design this space as inclusive as possible. To help aid this already fully accessible play space, eibe Play included their brand new Wheelchair Seesaw. This, as well as the Broad Slide, various sea-themed play panels and the eibe Nest Swing seat, eibe Play believe they have chosen the right amount of play equipment that makes this play space accessible for all.
As previously mentioned, the play area’s safer surfacing has been designed to ensure it’s fully accessible all year round. This was a significant part of their design thinking process. The design includes an entire wet pour surface laid over the existing surfacing in most areas. This allows us to provide an environmentally friendly option, as there will be no to take materials off-site for refuge. This follows eibe Plays, environmentally green ethos. After the council went through a consultation stage with the local community,eibe Play was privileged to be awarded the play area refurbishment contract. They quickly engaged with the council o refine the play equipment chosen, and after a couple of minor amendments, the manufacturing of the equipment commenced. The play area was opened by the council in time to be enjoyed by the children over a gloriously sunny winter’s weekend, and the initial feedback we have received has been very positive. eibe Play hope that Larkfield Play Area will be loved and well- used by local children for years to come!
Materials & Warranties aterials
Material Pine, softwood
The hard wearing, yet economical, play units of our ‘ecorino’ range, are particularly well suited for public areas. The popular playground-classics have been re-designed to include modern day advances including statics, visual appearance and educational appeal. The low maintenance aspects of ‘ecorino’ makes this product line particularity attractive for use in public areas. Best of all, the selection of play items and accessories is so wide that the perfect playground can be designed for any individual requirement, regardless of space or location.
Non Heart Post Feet 140mm 100mm Machine Sanded
A Key Point Summary • Wood is natural and smooth. Unlike metal, it is warm to touch • Easy to climb, play on, and environmentally friendly • You’ll be buying from a reliable and sustainable source • Protected from infestations and rot • After usage, the timber is 100% recyclable • Cannot be easily damaged • Minimal risk of cracking and splintering • With its numerous sections, it’s easy to replace a single piece • Graffiti is sanded down. Aesthetically more appealing than metal • High-quality joinery is a key characteristic of all eibe play equipment
Our many years’ experience in building play equipment is evident from the quality of the joinery and the detailed, sophisticated design, as well as the realisation by state-of-the-art woodwork machinery.
Available in the following Brands
140mmMachine Round Posts
140mmMachine Round Posts
100mmMachine Square Posts
100mmMachine Square Posts
Available in the following Brands Material Robina, hardwood Heart Wood Soft Grain Natural Touch Stainless Steel Bespoke
The wood is extremely hard, being one of the hardest woods available. It is very resistant to rot, and durable, making it prized for play, furniture, flooring, panelling, fence posts, and small water craft. robinia is one of the most rot-resistant local trees, Flavonoids in the heartwood allow the wood to last over 100 years in soil. As a young man, Abraham Lincoln spent much of his time splitting rails and fence posts from black locust logs.
A Key Point Summary • Wood is natural and smooth. Unlike metal, it is warm to touch
• Easy to climb, play on, and environmentally friendly • You’ll be buying from a reliable and sustainable source • Protected from infestations and rot • Use of natural oil glases to protect wood and are saliva and sweat resistant • After usage, the timber is 100% recyclable • Cannot be easily damaged • Minimal risk of cracking and splintering • Very high strength and durability, a natural life span of up to 50 years • Graffiti is sanded down. Aesthetically more appealing than metal • 15 year guarantee on hard wood timbers.
80mm ~ 200mm Hand Carved Posts
Steel Play Equipment
Play units must withstand high usage and stress. Metal materials are ideal in this situation to construct highly durable, easy to clean and safe play areas. With our metal products, eibe presents imaginative metal worlds that look sturdy, yet are extremely attractive. With their timeless design, the basic units are a perfect match for all types of terrains.
A Key Point Summary
• Interesting colour designs intrigue children
• Metal materials are highly durable, easy to clean and safe to play areas
• Stainless steel, galvanised steel and powder-coated options available
• Low cost of ownership thanks to easy-care concept
• Can withstand high usage and stress
• Large variety of individual component parts to design a play world
• Extremely attractive
• 100% recyclable after product lifecycle
High-quality joinery is a key characteristic of all eibe play equipment
Our many years’ experience in building play equipment is evident from the quality of the joinery and the detailed, sophisticated design.
Stainless Steel
Galvanised Steel
Powder Coated
Materials Overview
Stainless Steel: V2A stainless steel (1.4301) Corrosion resistant, temperature resillient, conductive, weldable, hygienic, lowmaintenance, long life, long guarantee
Steel: (S235JR)
All parts are carefully processed, deburred and surface treated depending on requirement
Small parts are galvanically zinc plated Larger parts are hot dip galvanised and powder coated if required
Foundations No Timber in the Ground
• eibe play equipment requires minimal maintenance. The timber can age naturally without any upkeep apart frommaintenance checks relating to moving components, nuts and bolts etc. If vandalism does occur then this can be easily addressed and remedied. For example, graffiti can be removed by sanding the wood, returning it to its natural condition without any need to re-treat the timber. Furthermore, should part of the equipment be deemed damaged beyond economical repair, due to its modular nature, eibe equipment may be easily repaired by replacing only the damaged section rather than a major section of the equipment. • eibe uses Galvanised or Stainless Steel feet, as required, for mounting our equipment onto the ground foundations and does not install timber support posts directly into the ground. With this and the CCB (Copper Chromium Boride) treatment, we have eradicated any problems or potential weaknesses in the structure of the equipment caused by rot or damp. All equipment is designed and installed to facilitate ease of access for inspection and maintenance throughout the whole of the play area • The wooden elements of the equipment will add a softness and subtlety to the play area which will not be present in an all- steel design. We believe in blending our designs into the natural environment and this is more easily achieved and aesthetically pleasing than non-organic materials.
Dual Fixing Method
Galvanised Steel Post Foot
Surfacing Rubber Bonded
Tested and compliant with EN1177 (certificate available upon request) Rubber Bonded Mulch is:
• Highly Slip Resistant • Fire Retardant • Impact Absorbing • Porous • High Durable • Versatile • Colour Variations (allowing for Theming and to suit the site context)
Rubber Mulch - A unique process that starts with recycling solid rubber that otherwise would go to landfill; consistent control of this process provides us with a carefully blended flat shred, which is then coloured with our unique encapsulation process that not only gives us a natural looking surface, but one that is soft and flexible, long lasting and bonds perfectly. Binder - A specially developed PU binder that is designed to work in cooperation with the shred size, the colouring process, and the requirements of a strong, yet flexible bond. This mixture is then simply spread out with a trowel. As this bonded shred system is self-supporting it requires no digging of foundations and the lack of large or heavy equipment makes it cost effective for even small or difficult access areas. Moreover it will easily work directly onto almost any existing ground conditions including grass or soil, old tiles or wet pour, crushed aggregate or concrete; it will follow the natural sloping contours of the ground and / or absorb undulations and can even be spread directly over tree roots and around plants.
Grass Matting Surfacing
An environmentally friendly, non slip impact absorbing safety and foot way surface.
The Rubber Grass Mat is our most versatile product with a multitude of uses in commercial environments. Rubber Grass Mats are designed to protect the ground and grass from becoming churned up and muddy; the ring-hole form allows grass to grow back through the mat, preserving the green and fresh look of your lawn! They are extremely easy to install using our pegs and cable ties; just fix into the ground using the pegs and attach each mat using the cable ties. Our Rubber Grass Mats are manufactured to the highest quality and standards using recycled rubber. We inspect each item before shipping to ensure that you receive only the best, and most effective, ground protection products. • Moulded non-slip cellular structure with excellent durability and comfort • No costly base works (as required for conventional tiles for wet pour) • Ideal for green eld sites, disappears from view once turf has re-grown • Can be used on at or contoured landscapes • Suitable for all weather, extreme temperatures and resists wind uplift • Tested to BS EN 1177:1998 3 Metre Critical Fall Height Wheelchair and pushchair accessible • 25mm holes in Rubber grass mats allow efficient drainage • Maintenance free • Can be laid on flat or contoured surfaces • Manufactured from recycled rubber • Wheelchair Friendly Maintenance: • The Matting solution is maintenance-free, keeps grassed areas looking neat and allows the grass to be cut with a conventional mower • Absorbs Shock and noise • Critical fall height of 3 meters, tested by RAPRA • Protects oor and equipment, Added protection for grass
Our Installation Team Quality install and after-care
On successful award of tender eibe will plan in the installation with our premium installation team RP Bayliss Groundwork
Our Installer: Ryan is our most senior installer and has worked on 100’s eibe playground installations over the last 15 years. Ryan has set his own high standards to work to and along side our expectations we can guarantee a safe, secure and conforming playground installed to the specifications set.
Ryan
Lyme Regis
Cobtree Manor
Colchester Zoo
Quality: Regular training is provided including changes to the HSE to important updates from the British Standards. It is key for us to provide and up to date installation method leaving a clean bill of health from the independent inspection. Geographical Restrictions: In certain circumstances it may be viable to source local contractors for your installation. We pride ourselves on transparency and clarity and are happy to provide references and examples of work for all of our installation teams.
Middle Park, Brighton
Added Value Long Term customer Support and Service We would like to reinforce eibe’s commitment to working with our Customers as part of a long term relationship. eibe would like to make the following additional offers to form part of this contract at no cost: Spare Parts Where spare parts are required as a result of maintenance inspections or excessive wear eibe will supply these spare parts at no additional cost during the first two years following Customer sign-off. (Please note: This is dependent upon a suitable maintenance regime being in place and that any spares required as a result of vandalism are excluded). Maintenance Staff Training – Workshop eibe would like to offer the Customer a free Maintenance Training Workshop. This will be open to all Customer Maintenance staff and those directly responsible for the running, management and up-keep of the area being developed under the contract. The Workshop will be undertaken by eibe’s Contracts Manager and performed at the site following practical completion (and on a date suitable to the Customer). The workshop will be an introduction for all staff to eibe as a company, the team and who to contact in relation to help and assistance, ordering spare parts etc.
In addition, Customer staff will be shown around the area and practical demonstrations will be carried out with regards to the maintenance and suggested approach taken to successfully managing and maintaining the developed sites. A specific agenda will be drawn up in conjunction and agreement with the Customer prior to the event taking place.place.
Summary The above offers are made to further assist our Customers in areas in which they will need to consider moving forward from contract completion, such as the lifetime of the of the installation, and the long term cost of ownership associated with the regular and unforeseen maintenance etc. These offers illustrate that eibe is committed to working alongside the Customer for the life of the area to make it as much a success for the years to come as it is at the time of opening.
Insurance Letter
eibe Play Ltd has a wide range of accreditation and certification covering everything frommaterial and sourcing aspects of its work such as FSC certification, through to Play Industry recognition and affiliation with the API (Association of Play Industries). All aspects of eibe’s business and works are duly tested, verified and certified to ensure quality throughout the business, and providing its customers with the peace of mind that they are engaging into contracts with a reputable, professional and high profile Play Company. Please see below some examples of these. If you would like to receive electronic copies of any certificates they are readily available upon request. Industry Recognised Certification: Accreditations and Certification Quality & Process
CERTIFICATE OF MEMBERSHIP This is to certify that
Membership Certificate EIBE Play Ltd
Is a Member of RoSPA until 01/02/2024
As a member, this organisation supports RoSPA’s mission to save lives and reduce injuries
eibe Play Ltd
Has been accepted as a member of the Association of Play Industries
402392316
Membership No:
2023
E0033
Member Number
Valid For
Errol Taylor Chief Executive of RoSPA
Deborah Holt, Membership Manager
The Royal Society for the Prevention of Accidents Patron: Her Majesty The Queen Registered Charity No. 207823 CERTIFICATE
CERTIFICATE
The Certification Body of TÜV SÜD Management Service GmbH certifies that
The Certification Body of TÜV SÜD Management Service GmbH certifies that
eibe play ltd. Forsyth Home Farm, A3 Bypass Road Godalming Surrey GU8 6AD United Kingdom
eibe Produktion + Vertrieb GmbH & Co. KG Industriestraße 1, 97285 Röttingen Germany
has established and applies an Environmental Management System for
has established and applies a Quality Management System for
Development, production and distribution of playground equipment, leisure facilities and active play equipment.
Distribution of playground equipment, l eisure facilities and active play equipment .
An audit was performed, Order No. 70014909 . Proof has been furnished that the requirements according to ISO 14001:2015 are fulfilled. The certificate is valid from 2020-04-21 until 2023-04-14 . Previous certificate valid until 2020 - 04 - 14. Certificate Registration No.: 12 104 15757 TMS .
An audit was performed, Order No. 70014909 . Proof has been furnished that the requirements according to ISO 9001:2015 are fulfilled. The certificate is valid in conjunction with the main certificate from 2020-04-21 until 2023-04-14 . Certificate Registration No.: 12 100 15757/03 TMS .
Product Compliance Management Munich, 2020 - 04 - 21
Product Compliance Management Munich, 2020 - 04 - 21
Located in Bavaria, Germany Covering nearly five Hectares the eibe factory and main hub is equivalent to almost nine football fields. The site comprises of two factory floors, assembly area, Design and Management building a large training and competence centre know as the “house of kinders”. Also not one, but two outdoor showrooms which feature top secret new exciting innovated projects and products. These products are built as prototypes and then finely tuned ready for their TUV inspection. eibe Factory
Goods In
Goods Out
Factory Tours are welcome
Factory Floor
4.78 Hectares
Training and competence centre
Design Studio
Factory Floor
Outdoor Play Showroom
eibe UK
Located near Guildford, Surrey Bavarian Craft, British Creation
Goods Out
German - Anglo relations are bilateral, our strong association can be traced back many centuries. In more recent years historians have closely studied the mutual cultural, ideological and technological influences both nations share.
At eibe UK we are immensely proud of our German heritage. Since the UK team was established in 1995 we have taken significant steps in transforming the brand, taking full ownership of our own direction & influence within the UK. Based in Guildford, Surrey, our independent team of designers, consultants and project managers can provide all the expertise and professional knowledge required to deliver your perfect play area. Our vast portfolio of products allows our professional team of in-house designers to create bespoke play solutions to your exact requirements that will thrill children for years to come.
Goods In
The eibe UK journey 1. Research & Development 2. Manufacturing craftmanship 3. Delivery to UK 4. Consultation process
5. Concept designs 6. Developed design 7. Delivery to client 8. Installation 9. Surfacing 10. Handover & after care
eibe House
We look forward to working with you on your new, exciting project!
Made with FlippingBook. PDF to flipbook with ease