Wrexham Mood board
Ponciau Park Wrexham County Borough Council
Ponciau Park Wrexham CBC
AGE RANGE 4-16
Wetpour
12
11
10
9
8
7
6
5
4
3
2
1
CHECK DRAWING SCALE
FOUNDATION NOTE: It is important the correct foundation level is used when ordering. FL1: 400mm Standard Leg Use this for standard installation, grass surface, inclined ground, loosefill FL2: 30~110mm Short Leg For Synthetic Surface, installed onto pad
H
H
Disclaimer: 1.
This is NOT a construction drawing 2. Images shown are for layout purposes only and may differ from actual product supplied. 3. All installation measurments should be taken from the supplied installation instructions 4. Any discrepancy found between information shown and measurments taken from site should be reported to eibe immediatley 5. Full area measurments are to be checked before installation can proceed 6. Check foundation level requirements for each item GENERAL NOTES If not indicated on this plan, north point must be confirmed prior to installation to ensure that slides do not face due south. Exact positions & orientation of new items may be subject to a final site survey and setting out plan. Any inconsistencies on site should be verified with eibe before commencement of work. eibe recommend that existing trees are risk-assessed by the client to ensure the integrity of accessible branches, that overhanging limbs do not conflict with new play equipment or vehicle access and that the canopy will not produce excessive leaf drop which could cause a hazard within the play area. This design layout conforms to the relevant EN Safety Standard. GRASS & GRASS MAT SURFACING Where equipment is installed directly into grass and the free height of fall is between 0.6m and 1.5m it is the responsibility of the playground operator to ensure that the grass sward is maintained in good order. Where equipment is installed with grass mat surfacing it is the responsibility of the playground operator to ensure that the grass is maintained in good order. When laid directly onto existing grass this surface will follow the natural contours of the ground. RUBBER MULCH SURFACING eibe recommend the use of a 50mm stone base when installing rubber mulch. If installed without the finished surface will be a reflection of the ground beneath it, following any undulations, & will not be a completely flat surface. Rubber mulch will not cure any existing drainage problems & will require foundations and/or some kind of drainage system prior to installation.
G
G
F
F
E
E
SPINNING PLAY
SOCIAL PLAY
D
D
Namaka Pendulum carousel
C
C
Drawing Signed Off By:
Date
Namaka Spinner 5560800
THIS DRAWING MUST BE SIGNED OFF BEFORE INSTALLATION CAN PROCEED
A
Rev No.
Date
Revision Description
B
B
Product Number : 5560800 Materials : Stainless steel, Hdpe Minimum space : Ø 1085x445 cm Safety Surface Area : 79,0 m² Free falling height : 150 cm Foundations : 1 x PFs
eibeplay Ltd, Forsyth's Home Farm, A3 Bypass Road, Hurtmore, Surrey, GU8 6AD
N
A1
Tel: 01483 813 834 Email: eibe@eibe.co.uk
79m2 of Wetpour
01/03/2023 Date
1:50 Drawing Scale
Designer
MO
Customer
Ponciau Play Area Wrexham CBC
A
A
Project
Quote No.
1 / 1 Revison Sheet
Customer No.
60131144 10009876
12
11
10
9
8
7
6
5
4
3
2
1
This is a concept design only, Actual colours and features may change at any time. This document is protected by copyright and is the property of eibe. It may neither be copied nor duplicated without our written consent. It may not be imparted or made accessible to a third person. A further usage needs the consent of eibe. Unlawful usage is liable to prosecution and is obliged to compensation.
•
A Y
I N
C
L
P
L
U
E
S I
V
S I
V
E
U
P
L
L
C
A Y
I N
•
•
A Y
I N
C
L
L
P
U
E
S I
V
S I
V
E
U
P L
L A Y • I N C L
A Y • I N
C
L
P
U
E
S I
V
S I
V
E
U
P
L
L
C
A Y
I N
•
•
A Y
I N
C
L
L
P
U
E
S I
V
S I
V
E
U
P
L
L
C
A Y
I N
•
Case Studies
Case Study Essenhigh Drive
Client:
Budget:
Adur and Worthing Councils
£24,000
Start Date:
Completion Date:
11th August
14th August 2022
Contact:
Title:
Graeme Booker
Head Ranger
email:
Phone:
graeme.brooker@adur-worthing.gov. uk
Adur and Worthing Council and eibe Play share a fantastic relationship and have worked on numerous projects over the past few years. The council asked eibe Play to quote for a like-for-like stainless steel slide, as the current one was severely damaged. An eibe representative met the council on site to scope the installation and the required slide type. It was clear that a bespoke slide was needed due to the size of the mound and the castle structure that the slide attached to at the top. eibe Play specialised in bespoke measuring and custom builds, therefore was more than happy to get involved. The new stainless- steel slide was ordered to the required length and size and installed in sweltering weather conditions. The installation was successful, and eibe Play completed it with a repaired wetpour surface around the slide to give extended life to the existing surfacing. eibe Play hope this slide will be loved and well used by local children for years to come!
Case Study Adur Rec
Client:
Budget:
Adur and Worthing Councils
£25,000
Start Date:
Completion Date:
9th Jan 2023
18th Jan 2023
Contact:
Title:
Craig Ifield
Ranger
email:
Phone:
craig.ifield@adur-worthing.gov.uk
Adur and Worthing Council and eibe Play share a fantastic relationship and have previously worked on various play spaces across Worthing, including Tarring Park and Gull Island. Following these successful projects, eibe Play was asked to visit Adur Recreational Ground to meet the council’s Ranger teams and to discuss the potential options open to the council to replace a climbing unit that had come to the end of its working life.
The play area is very popular with the local residents , and as it is located right next to the River Adur, it is often used as a destination by families out for a walk along the River. Families frequently use the fields surrounding the play area for picnics, dog walkers and community events. The council approached local schools and communicated via their social media streams to ask the general public what they would like and what their preferred climbing unit was. After a few weeks of gathering votes, the council chose to use our amazing play unit Similaun. The council and public were drawn to the unique duo slide, as well as the challenging climbing nets and crossings. They were also overjoyed to hear that this was the first one to be installed in the UK, as it is new to the eibe Plays range. The Play Unit Similaun, is designed for children aged between 5-12 years old and is from our popular Ecorino range. Made fromdurable Pine with galvanised steel feet, this fantastic unit is the perfect match for any natural play space. Themetal feet ensure nomoisture
will affect the timber, and with its stainless steel fixings, it is also perfect for a seafront or waterside location. The Similaun is also packed full of play features, including the unique tunnel net, tunnel and challenging ramp and criss-cross ladder. Once the children access the top of the Similaun Unit, they can enjoy the great views across the river and beyond. eibePlaywasaskedto install theclimbingunit into theexisting bark pit and started the installation by laying the groundwork and footings ready for the assembly of the climbing unit. The works were carried out during the winter of 2023, so our installation team had to deal with both rain and severe frost; however, theymade a good process andmanaged to complete the installation within ten days. The play area was opened by the council in time to be enjoyed by the children over a gloriously sunny winter’s weekend, and the initial feedback we have received has been very positive. eibe Play hope that the Similaun Unit will be loved and well- used by local children for years to come!
Materials
Steel Play Equipment
Play units must withstand high usage and stress. Metal materials are ideal in this situation to construct highly durable, easy to clean and safe play areas. With our metal products, eibe presents imaginative metal worlds that look sturdy, yet are extremely attractive. With their timeless design, the basic units are a perfect match for all types of terrains.
A Key Point Summary
• Interesting colour designs intrigue children
• Metal materials are highly durable, easy to clean and safe to play areas
• Stainless steel, galvanised steel and powder-coated options available
• Low cost of ownership thanks to easy-care concept
• Can withstand high usage and stress
• Large variety of individual component parts to design a play world
• Extremely attractive
• 100% recyclable after product lifecycle
High-quality joinery is a key characteristic of all eibe play equipment
Our many years’ experience in building play equipment is evident from the quality of the joinery and the detailed, sophisticated design.
Stainless Steel
Galvanised Steel
Powder Coated
Materials Overview
Stainless Steel: V2A stainless steel (1.4301) resilient, conductive, weldable, hygienic, lowmaintenance, long life, long guarantee Corrosion resistant, temperature
Steel: (S235JR)
All parts are carefully processed, deburred and surface treated depending on requirement
Small parts are galvanically zinc plated Larger parts are hot dip galvanised and powder coated if required
HDPE
High Density Polyethylene
HDPE
• UV stabilized for fade resistant outdoor use • Will not rot, delaminate, splinter or crack • Stain and graffiti resistant for easy cleaning
• Durable orange peel textured finish • Moisture and chemical resistant • High impact resistant • 100% recyclable and non toxic • Easily machined and engraved • No heavy metals • No phthalates
High Density Polyethylene (HDPE) sheets are extruded and co-extruded thermoplastic materials that are used worldwide in the manufacture of panels and components for the Playground, Sport, Leisure and Recreation Industries. The versatile properties of this material, including UV stability, make it resistant to fading, moisture, weather, stain and graffiti. The perfect choice for outdoor environments. HDPE is easily routed or engraved using current CNC technology, in the case of 2-colour sheet options, you can remove the outer colour and revealing the colour inside to create almost unlimited design capabilities. Increasingly used across a wide range of industries and applications, HDPE panels are being used to replace timber and composite panel components. Whilst the initial cost of these materials may be lower, the long-termmaintenance requirements and shorter life expectancy make their choice a false economy. HDPE also offered as softer, warmer and more play friendly feel to it. In addition to all the product and user benefits, HDPE is 100% recyclable
Surfacing
Wetpour Safer Surface
Tested and compliant with EN1177 (certificate available upon request) EPDM wetpour is: • Highly slip resistant • Fire Retardant • Impact Absorbing • Porous • Highly Durable • Versatile • Colour Use of this safety surfacing through the majority of the newly proposed play area will allow for a significant decrease in the maintenance burden which is likely on the current site. Edges with Pre- Cast Concrete edging and set upon a compacted MOT Type 1 base this surfacing will provide a low maintenance, highly durable safety surface solution for the high volume of footfall the site is likely to see. In addition, the opportunity to introduce colour and vibrancy will enhance the play proposals and offer extended opportunities for creative play. It will also provide opportunities for those with visual impairments to engage within the play environment through visual stimulation, and allow for users of all abilities access onto and throughout the proposed play environment. • Highly UV- and weather stable (When using Aliphatic Binder) • Dust free granules • No colour bleeding • Colour consistency • No batch to batch variation between bags • Granules have been shaped to optimise slip resistance, spread rate and surface strength Maintenance: Wetpour is a low maintenance product. However, it should undergo routine inspection and maintenance to keep it in optimum condition. The extremely high quality is guaranteed throughout:
Construction Method Statement Example Construction Method Statement Access to the site will be from School Lane We intend to use delivery vehicles which are suited to the site access con- straints. We will arrange for a key to be available to unlock the maintenance gate prior to commencement on site We will minimise the number of vehicles on site to ensure that the path remains open to allow public access. We propose to use the car parking area adjacent to the play area to locate our compound and the details will be agreed prior to com- mencement on site. The site security etc are detailed below. These are our provisional plans and will be confirmed with you prior to commencement on site. eibe is a member of the Association of Play Industries (API) and is committed to work with you to deliver your playground project in the timescales proposed and to the required high-quality standard. We confirm that we have visited the sites, reviewed and analysed your requirements so that we have a detailed understanding of the scope of these requirements. Stakeholder Liaison . We encourage regular communication with our clients/stakeholders to ensure that current infor- mation is available to all who require it. This keeps everyone informed and ensures that any issues such as Health and Safe- ty are addressed and resolved before they become significant. During the lifecycle of a project, regular external and internal project meetings are held including the weekly meetings with you. The agendas will include; progress, programme, H&S, quality, variations, KPIs and any issues or complaints. In addition, the internal meetings will also include the financial reporting and planning aspects. All eibe contracts are organised and overseen by our projects team in accordance with our ISO 9001 accredited quality management system, and operates in accordance with the Construction Design and Management (CDM) Regulations 2015. They are responsible for the logistics and organisation of all contractual elements and areas related to works pro- gramming, method statements/risk assessment, supplier and on-site management, on-site meetings and all other aspects of operational works to ensure the successful delivery to the high level of construction quality required. We maintain a close and professional working relationship with customers throughout the project and we will provide weekly reports and review the proposed schedule of works and major milestones through to completion. The project manager contacts the site foreman daily to ensure that he is aware of the current status and gaining prior knowledge of potential delays or H&S issues and updates regarding the progress of the installation. Our office team main- tains regular contact with the client, installation teams, suppliers and service providers ensuring a smooth project delivery. Daily contact with our installation teams means we can spot potential problems and resolve them before they become tan- gible issues. Their progress is documented by uploading photographs of the work accomplished during the day. The projects manager will visit the sites during the installation phase and the Projects team holds a daily meeting to dis- cuss each project.
On completion of the installation, an independent inspection by an accredited RPII body will be undertaken as a prerequi- site to your acceptance of the site. Health and Safety – Our Projects team is trained to and are operating in accordance with the 2015 CDMC Regulations. We will create a CDM Phase Plan and Risk Assessment and Method Statement (RAMS) which will be agreed prior to com- mencement on site All goods supplied or work carried out will conform to the relevant EN1176 and EN1177 standards where applicable, as detailed in your specification. We are registered under the SSIP approved CHAS scheme and are members of Constructionline (No 72499) • Proposals phasing and safe working zones during construction. We intend to use a local installation team to ensure the site is completed on time. Our team has many years of experience installing similar sites for eibe. Site Management - A site-based Foreman is responsible for the management and supervision of all on-site operations and personnel, overseen by eibe’s SMSTS qualified Projects manager supported by Office based staff and the Regional Play Con- sultant. Our site foreman is SSSTS qualified. All personnel will undergo a site induction prior to gaining access to the site. Security, Storage and Site Establishment - Heras fencing (double-locked) will be erected for the duration of works. All equipment will be stored within the site boundary. Smaller items and tools are stored in vehicles. Site Access and Deliveries - We plan for all equipment and goods being delivered on vehicles where it can be offloaded using suitable plant and transported to an appropriate location within the working site/compound area. Appropriate site rules will be adopted for the movement of equipment on and off Lorries, and the movement of equipment to and from the installation site location. We plan to undertake these activities during quiet periods of the day, wherever possible, using at least one banksman and appropriate signage erected.
Signage - Required HSE signage will be used; - Health and Safety, Access, Speed Limits, Danger Construction Site, etc.
Our Installation Team for you Quality install and after-care
On successful award of tender eibe will plan in the installation with our premium installation team RJ Playgrounds
Our Installer: Ray is our most senior installer and has worked on 100’s eibe playground installations over the last 25 years. Ray has set his own high standards to work to and along side our expectations we can guarantee a safe, secure and conforming playground installed to the specifications set.
Ray
Houndwell Park
Bolton Centre
Legoland
Quality: Regular training is provided including changes to the HSE to important updates from the British Standards. It is key for us to provide and up to date installation method leaving a clean bill of health from the independent inspection. Geographical Restrictions: In certain circumstances it may be viable to source local contractors for your installation. We pride ourselves on transparency and clarity and are happy to provide references and examples of work for all of our installation teams.
Abbey Meadows, Abingdon
eibe Play Ltd has a wide range of accreditation and certification covering everything frommaterial and sourcing aspects of its work such as FSC certification, through to Play Industry recognition and affiliation with the API (Association of Play Industries). All aspects of eibe’s business and works are duly tested, verified and certified to ensure quality throughout the business, and providing its customers with the peace of mind that they are engaging into contracts with a reputable, professional and high profile Play Company. Please see below some examples of these. If you would like to receive electronic copies of any certificates they are readily available upon request. Industry Recognised Certification: Accreditations and Certification Quality & Process
CERTIFICATE OF MEMBERSHIP This is to certify that
Membership Certificate EIBE Play Ltd
Is a Member of RoSPA until 01/02/2024
As a member, this organisation supports RoSPA’s mission to save lives and reduce injuries
eibe Play Ltd
Has been accepted as a member of the Association of Play Industries
402392316
Membership No:
2023
E0033
Member Number
Valid For
Errol Taylor Chief Executive of RoSPA
Deborah Holt, Membership Manager
The Royal Society for the Prevention of Accidents Patron: Her Majesty The Queen Registered Charity No. 207823 CERTIFICATE
CERTIFICATE
The Certification Body of TÜV SÜD Management Service GmbH certifies that
The Certification Body of TÜV SÜD Management Service GmbH certifies that
eibe play ltd. Forsyth Home Farm, A3 Bypass Road Godalming Surrey GU8 6AD United Kingdom
eibe Produktion + Vertrieb GmbH & Co. KG Industriestraße 1, 97285 Röttingen Germany
has established and applies an Environmental Management System for
has established and applies a Quality Management System for
Development, production and distribution of playground equipment, leisure facilities and active play equipment.
Distribution of playground equipment, l eisure facilities and active play equipment .
An audit was performed, Order No. 70014909 . Proof has been furnished that the requirements according to ISO 14001:2015 are fulfilled. The certificate is valid from 2020-04-21 until 2023-04-14 . Previous certificate valid until 2020-04-14. Certificate Registration No.: 12 104 15757 TMS .
An audit was performed, Order No. 70014909 . Proof has been furnished that the requirements according to ISO 9001:2015 are fulfilled. The certificate is valid in conjunction with the main certificate from 2020-04-21 until 2023-04-14 . Certificate Registration No.: 12 100 15757/03 TMS .
Product Compliance Management Munich, 2020-04-21
Product Compliance Management Munich, 2020-04-21
Located in Bavaria, Germany Covering nearly five Hectares the eibe factory and main hub is equivalent to almost nine football fields. The site comprises of two factory floors, assembly area, Design and Management building a large training and competence centre know as the “house of kinders”. Also not one, but two outdoor showrooms which feature top secret new exciting innovated projects and products. These products are built as prototypes and then finely tuned ready for their TUV inspection. eibe Factory
Goods In
Goods Out
Factory Tours are welcome
Factory Floor
4.78 Hectares
Training and competence centre
Design Studio
Factory Floor
Outdoor Play Showroom
eibe UK
Located near Guildford, Surrey Bavarian Craft, British Creation
Goods Out
German - Anglo relations are bilateral, our strong association can be traced back many centuries. In more recent years historians have closely studied the mutual cultural, ideological and technological influences both nations share.
At eibe UK we are immensely proud of our German heritage. Since the UK team was established in 1995 we have taken significant steps in transforming the brand, taking full ownership of our own direction & influence within the UK. Based in Guildford, Surrey, our independent team of designers, consultants and project managers can provide all the expertise and professional knowledge required to deliver your perfect play area. Our vast portfolio of products allows our professional team of in-house designers to create bespoke play solutions to your exact requirements that will thrill children for years to come.
Goods In
The eibe UK journey 1. Research & Development 2. Manufacturing craftmanship 3. Delivery to UK 4. Consultation process
5. Concept designs 6. Developed design 7. Delivery to client 8. Installation 9. Surfacing 10. Handover & after care
eibe House
We look forward to working with you on your new, exciting project!
Made with FlippingBook flipbook maker